A professional solution provider for industrial energy storage and electric vehicle charging piles
2013
Automatic delivery room
31,600
m²industrial park
25,000
m²manufacturing plant
safety protection value/less than the safety protection value or 0.5 times the rated voltage.
Solution:Waiting for the three-phase voltage to return to normal
Analysis:The d-axis voltage is less than 60% of the effective value of the grid voltage, or the phase sequence is connected incorrectly.
Solution:Wait for the grid voltage to return to normal. Or adjust the order of three-phase connection
Analysis:AC slave contactor failure reported three consecutive times
Solution:Contact after-sales personnel to replace the contactor with a new one
Analysis:Three consecutive reports of AC main contactor failure.
Solution:Contact after-sales personnel to replace the contactor with a new one
Analysis:Three consecutive reports of DC auxiliary contactor failure.
Solution:Contact after-sales personnel to replace the contactor with a new one
Analysis:Three consecutive reports of DC main contactor failure.
Solution:Contact after-sales personnel to replace the contactor with a new one
Analysis:Battery bus voltage too high
Solution:Check the bus voltage in the operating data, and run PCS again when it drops below 200V.
Analysis:When parallel or connecting to bypass cabinet, the communication resistance value is incorrect or the wiring is incorrect. In the case of parallel operation, the parallel address settings are duplicated.
Solution:Check if the wiring of the CANB interface is correct. In the event of a power outage, the normal communication resistance range for measuring the resistance value of CANB should be 60-120 ohms. The communication resistance value can be changed by adjusting the CANB DIP switch on the control board. In the case of parallel operation, set the parallel addresses in order based on the number of parallel operations, from 1 to 4.
© 2024 Shenzhen ATESS Power All Rights Reserved. 粤ICP备2023127387号 by GrowthMan